Pod rutier “Nicolae Teclu”

 
  • TIP LUCRARE/ADRESĂ: CONSTRUCȚIE POD / STR. NICOLAE TECLU - SPLAIUL UNIRII
  • DURATA LUCRĂRII: 16.3.2020 - 20.7.2020
  • COST TOTAL: 4.447.038,31 Lei inclusiv TVA